Example-1: Monitoring Backup Duration
0
20
40
60
80
100
120
9/7/97
9/21/97
10/5/97
10/19/97
11/2/97
11/16/97
11/30/97
12/14/97
12/28/97
1/11/98
1/25/98
2/8/98
2/22/98
Date
Backup_Time_Minutes
Backup SLA Exceeded!
Network Utilisation caused the problem!
Network throughput degraded on both systems